Home  |  Company Overview  |  Contact Us
Civil Engineering  |  Mining Engineering  |  GIS/GPS  |  Energy  |  Environmental  |  FTP

Projects

 
New Birth of Charlotte Church
 
The New Birth of Charlotte Church is an 80,941 square foot church located on a 25.8-acre site originally addressed as 11901 Sam Furr Road in Huntersville North Carolina.  Part of the development of the site is the construction and platting of approximately 800 linear feet of new street named New Birth Drive.  The Church is now addressed as 17001 New Birth Drive, Huntersville, North Carolina.
 
The church is an 80,941 square foot facility includes a sanctuary of 2,338 seats, an 11,933 square foot multi-purpose area, offices, conference rooms, a kitchen, recreation spaces, as well as a café/bookstore.  The site has the parking lot capacity of 455 vehicles with a softball and soccer field amenity.  The sanitary sewer service is provided with a pump station and approximately 2,000 linear feet of force main.  There will be approximately 1,300 feet of improvements to Sam Furr Road (NC 73) in accordance with the NCDOT.
 

MGES provided the following services for this project:

  • Boundary and Topographic Survey
  • Property Platting
  • Civil Engineering Design
  • Site Permits
  • Prepared a FEMA LOMAR for the site
  • Construction Staking
  • Inspections for Utility Certifications
  • Sedimentation and Erosion Control Inspections in accordance with Mecklenburg County
  • Construction Administration  
  • Preparation of As-Built and Record Drawings for the Certification of Utilities
 
 
 
 
 
 
 
 
 
View Larger Image                               Site Plan
 
View Larger Image                        Grading Plan
 
View Larger Image              Topographic Survey
 
Back To Project List
Civil Engineering  |  Mining Engineering  |  GIS/GPS  |  Energy  |  Environmental  |  FTP
   
Halstead Design - Lake Norman Website Design & Development Halstead Design